Options
Variable sampling interval run sum <i>X</i>‾ chart with estimated process parameters
Journal
MATEC Web of Conferences
ISSN
2261-236X
Date Issued
2018
Author(s)
Editor(s)
C. Hamontree
DOI
https://doi.org/10.1051/matecconf/201819201012
Abstract
<jats:p>The <jats:italic>X</jats:italic>‾ type control chart is often evaluated by assuming the process parameters are known. However, the exact values of process parameters are hardly known and thus Phase-I dataset is needed to estimate them. In this paper, the performance of the variable sampling interval run sum <jats:italic>X</jats:italic>‾ chart with estimated process parameters is evaluated by using the performance measure of the average of the average time to signal (AATS) and the optimal design of the proposed chart in minimizing the out-of-control AATS is developed. The performance measure of the standard deviation of the average time to signal (SDATS) is then used to identify the number of Phase-I samples (w) needed to have an in-control AATS performance close to its known process parameter case. Results show that large w is needed to minimize the performance gap between known and unknown process parameters cases of the VSI RS <jats:italic>X</jats:italic>‾ chart.</jats:p>
File(s)
Loading...
Name
Picture1.png
Type
personal picture
Size
3.11 KB
Format
PNG
Checksum
(MD5):21881560e0c3c9c06b18c6e8fdc11acf
